Overview
Each Item to be manufactured is assigned a Routing Master, detailing all the required process steps. Routings are assigned to Items directly though the Routing Master / Item relationship if a routing is unique to the item. Routings may also be assigned to Items indirectly through the assignment of a Commodity Code-specified Item Master relationship, if a Routing is common to many items. Item Master records with common routing processes need to be assigned to the same Inventory Commodity Code to take advantage of this option. One item using that Commodity Code is then specified on the Commodity Code tab “Misc’, as the ‘Routing Item’. A Routing Master is created for that item. All other items assigned to that Commodity Code will then use this Master Routing whenever they are produced, as long as the item does not have a unique Item/Routing. That unique Item/Routing is always the default if it exists for the part being produced. If no Item/Routing exists, the system checks for the Commodity Code Routing Item to find the correct Routing.
Navigation
Routing Master
Process
- Navigate to the List View, showing all existing Routings.
- Select New Routing Master button
- To enter a new routing master, click on the ‘New Routing Master’ button, shown above.
Fields
Division: The Manufacturing Division this Routing Master is associated with.
Site: The site within the division that this routing is associate with.
Item Number: The Item Number that will be manufactured using this Routing.
Responsible Planner: The Manufacturing User designated as the Responsible Planner for this Routing Master. This is primarily a reference field for filtering reports and/or query
Responsible Engineer: The Manufacturing User designated as the Responsible Engineer for this Routing Master. This is primarily a reference field for filtering reports and/or queries.
Select the Save button
The page will refresh presenting the header information and Routing Operation Tab in which the individual Routing Operations are entered will display.
To Clone an existing routing master to another Engineering Item Master
NOTE The Engineering Item Master record must have been created before a routing can be cloned to an item.
Navigation
Routing Master
List View: Select the Routing Master to be cloned: Left mouse the Name value
Left Mouse the Clone button. New Page will display.
Fields
Division: Defaults
Site: Defaults or select as appropriate
Item Number: Engineering Item Number of item to have the routing cloned to
Responsible Planner: Defaults or select as appropriate
Responsible Engineer: Defaults or select as appropriate
Save button. Page will re-display showing the Routing Operations copied.
NOTE Enter additional operations or edit or delete existing operations. Then Save button