Inventory Item by Project - Avg Cost tab

« Go Back
Article

Overview

The average cost of material used for this Project-Item, broken down by cost elements.

Fields
 

Avg Cost, Material:  The Average Unit Material Cost for this Item Number, for this Project. This same Item Number could have different costs if it exists in a different project.

Avg Cost, Material Overhead:  The Average Unit Material Overhead Cost for this Item Number, in this Project. The Overhead value is calculated as a factor of the Material Cost when the Item is added to the Project Inventory. This same Item Number could have different costs if it exists in a different project.

Avg Cost, Labor:  The Average Unit Labor Cost for this Item Number, in this Project. This same Item Number could have different costs if it exists in a different project.

Avg Cost, Labor Overhead:  The Average Unit Labor Overhead Cost for this Item Number, in this Project. The Overhead value is calculated as a factor of the Labor Cost when the Item is added to the Project Inventory. This same Item Number could have different costs if it exists in a different project.

Avg Cost, Fringe Overhead:  The Average Unit Fringe Overhead Cost for this Item Number, in this Project. The Overhead value is calculated as a factor of the Labor Cost when the Item is added to the Project Inventory. This same Item Number could have different costs if it exists in a different project.

Avg Cost, Machine Overhead:  The Average Unit Machine Overhead Cost for this Item Number, in this Project. The Overhead value is calculated as a factor of the Labor Cost when the Item is added to the Project Inventory. This same Item Number could have different costs if it exists in a different project.

Avg Cost, Subcontract Material:  The Average Unit Subcontract Material Cost for this Item Number, in this Project. This same Item Number could have different costs if it exists in a different project.

Avg Cost, Subcontract Labor:  The Average Unit Subcontract Labor Cost for this Item Number, in this Project. This same Item Number could have different costs if it exists in a different project.

Avg Cost, Freight:  The Average Unit Freight Cost for this Item Number, in this Project. This same Item Number could have different costs if it exists in a different project.

Avg Cost, Other Landed:  The Average Other Indirect Cost for this Item Number, in this Project. This same Item Number could have different costs if it exists in a different project.

Avg Cost, Total:  The Average Unit Total Cost for this Item Number, in this Project. This same Item Number could have different costs if it exists in a different project.
 