Salesforce

Operation Assignment by Work Center

« Go Back
Article

Overview

When a Routing and associated Operations are extracted to a Work Order, the Work Order operation has a “Labor Grade” assigned to the Operation, but not a specific Manufacturing User.  If there is the need to assign a specific Manufacturing User to a Routing Operation in a Work Center, this function is used.


Application

To assign a specific Manufacturing User to an Operation scheduled in a Work Center.  For example, a specific individual (Manufacturing User) has a level of skill which must be used in the Work Center for this operation.


Navigation

Work Orders or Scheduling-Capacity Planning > Operation Assignments by Work Center

Processing

Select the Work Center in which the assignments are to be done

Include Unreleased Operations (checkbox):  Unchecked, only Work Orders which have been released, Status:  4 and greater, are displayed.  If checked, released and unreleased Work Orders (status 2 and 3) are presented in the display.

The program will search the selected Work Center and display the appropriate Work Orders.

Use the pick list drop down in the “Assigned to” column to select the manufacturing user to be assigned to perform the routing operation.


Fields

Work Order:  The Work Order number.

Operation:  The operation on the Work Order in the selected Work Center.

Project:  The project identifier assigned to the Work Order.


Assigned to:  A dropdown pick list to select the manufacturing user to which the operation will be assigned. (See System Setup > Manufacturing User)

Released:  If a Work Order is not released, it can be released using this screen and checking the indicator box for the Work Order.  Click in the box and then ‘Save’ the record.

Started:  Checkbox.  If checked, indicates there has been Time and/or Quantity completions recorded to this operation.


Priority:  A priority calculation performed in the Work Order Scheduling function.

Scheduled Start Date:  The Work Order Scheduling function calculated operation Scheduled Start Date, which may be overwritten on the Work Order operation function.

Scheduled Completion Date:  The Work Order Scheduling function calculated operation Scheduled Completion Date based on lead time from the Start Date.

Scheduled Hours:  The Work Order Scheduling function calculated operation Scheduled Hours.

Actual Hours:  The actual hours that have been reported to this operation using the Time and Quantity Booking function.

 

SEE ALSO

Work Orders
Manufacturing Labor Grades
Work Order Scheduling
Routing Operations

Settings
Operation Assignment by Work Center
Operation-Assignment-by-Work-Center

Powered by